01
DOB permit coordination
Through qualified partners when needed.
Scaffold and shed systems planned around the building, public path, and applicable OSHA and NYC DOB requirements.
Each system is planned around the building, active scope, public path, and applicable site requirements.
01
Through qualified partners when needed.
02
Site-specific support when required.
03
Protection for the public path.
04
Access, netting, egress, and walking surfaces considered as the scope requires.
The building and work sequence guide a site-specific system that protects the work zone and the public path below.
01
Sidewalk circulation below the work.
02
Entrances, deliveries, and daily operations.
03
Work zones and protection needs above.
04
Installation, support, inspection planning, and removal.